Scheduled Monument Consent / Consent Application

Kisimul Castle, Castlebay, Barra - Overhaul of Chapel roof and replacement wall walk structures at several locations300083864

This decision is under consideration.

Summary

Overhaul of Chapel roof and replacement wall walk structures at several locations

Application Validated
28/11/2025
Target Date
01/02/2026
Deadline for Comments
19/12/2025
Email your comments about this case

Related Designations

  1. Kisimul Castle, Castlebay, BarraSM90347

    Designation Type
    Scheduled Monument
    Status
    Designated

    https://portal.historicenvironment.scot/designation/SM90347

Documents

Appeals to Scottish Ministers are processed on their behalf by the Planning and Environmental Appeals Division (DPEA).Appeal forms and guidance notes are available at The Planning System in Scotland on the Scottish Government website. The DPEA publishes all information and correspondence relating to appeals on the DPEA website. We only publish documents when we have been instructed by DPEA to make changes to a designation following an appeal decision. The DPEA search facility enables you to find everything held on the Scottish Government's file which will be considered before a decision is made on an appeal, including any plans, grounds of appeal, our response and any other correspondence. You can also view this information at our principal offices at Longmore House, Salisbury Place, Edinburgh EH9 1SH. Contact Us about this.

Where documents include maps, the use of this data is subject to terms and conditions.

  • Type
    Application
    Title
    SMC Application
    Download
  • Type
    Supplementary Information
    Title
    151 Proposed plans
    Download
  • Type
    Supplementary Information
    Title
    152 Proposed details
    Download
  • Type
    Supplementary Information
    Title
    154 Clerestory elevations
    Download
  • Type
    Supplementary Information
    Title
    156 Proposed Plans
    Download
  • Type
    Supplementary Information
    Title
    155 Existing walkways
    Download
  • Type
    Supplementary Information
    Title
    2025-CE-24 Chapel Roof Walkway Details
    Download
  • Type
    Supplementary Information
    Title
    157 Proposed Elevations
    Download
  • Type
    Supplementary Information
    Title
    158 Proposed Details
    Download
  • Type
    Supplementary Information
    Title
    Drawing register Chapel works & walkway Issue 1
    Download
  • Type
    Supplementary Information
    Title
    111B HANDRAIL AT KITCHEN
    Download
  • Type
    Supplementary Information
    Title
    112B HANDRAIL AT TANIST
    Download
  • Type
    Supplementary Information
    Title
    153 Site and location plan
    Download
  • Type
    Supplementary Information
    Title
    2025-CE-21 Chapel Roof Repairs Layout
    Download
  • Type
    Supplementary Information
    Title
    2025-CE-25 Chapel Roof Notes
    Download
  • Type
    Supplementary Information
    Title
    2025-CE-22 Chapel Roof Repair Details
    Download
  • Type
    Supplementary Information
    Title
    2025-CE-23 Chapel Roof Walkway Layout
    Download
  • Type
    Supplementary Information
    Title
    Desk-based Assessment
    Download
  • Type
    Supplementary Information
    Title
    150 Chapel clerestory survey
    Download

Related Decisions

There are no other decisions related to this decision.

Making Comments to us

This decision is in progress so you can make comments about it by clicking on the email link above. We cannot accept comments once we have made a decision, so please contact us as soon as possible, leaving enough time to consider your comments.

Review our Help with comments for guidance about commenting on decisions.

Privacy Notice

If you would like to make a comment about this decision, you should review our Privacy Notice

About Consent Application

Information in this record is about an application for Scheduled Monument Consent.

Most works, including repair, on scheduled monuments require Scheduled Monument Consent. We are responsible for determining applications for scheduled monument consent. Such applications will normally be determined within eight weeks of receipt of the application. We promote early pre-application discussions with prospective applicants. Contact Us for Application forms and further information.

Applications for Scheduled Monument Consent and the decisions taken on those applications are published on our online Portal. You can also view this information at our principal offices. Contact Us about this.

Where an application has been made to us but the person who made the application doesn't agree with the decision (or we haven't made a decision) they can appeal to Scottish Ministers.

Printed: 10/12/2025 09:20