Listed Building

The only legal part of the listing under the Planning (Listing Buildings and Conservation Areas) (Scotland) Act 1997 is the address/name of site. Addresses and building names may have changed since the date of listing – see 'About Listed Buildings' below for more information. The further details below the 'Address/Name of Site' are provided for information purposes only.

Address/Name of Site

GLEN AFFRIC HYDRO ELECTRIC SCHEME, MULLARDOCH DAMLB51703

Status: Designated

Documents

There are no additional online documents for this record.

Summary

Category
B
Date Added
11/02/2011
Local Authority
Highland
Planning Authority
Highland
Parish
Kilmorack
NGR
NH 22241 31365
Coordinates
222241, 831365

Description

James Williamson (engineer to North of Scotland Hydro Electric Board technical panel), W M Halcrow and Partners (engineers and contractors), 1952. Prominent large arrowhead plan dam with angled central bastion flanked by fixed spillways. Concrete mass gravity construction with some steel reinforcement. Battered downstream face with upstand parapet to flanking wings terminated by small control towers. Slightly recessed fixed spillways to centre flanking large angled centre buttress with deep parapet.

Statement of Special Interest

Mullardoch dam is a very large prominent dam of unusual arrowhead plan form. It is a key component of the Glen Affric hydro electric scheme, one of the major post-war hydro electric developments by the North of Scotland Hydro electric Board (NoSHEB). It is prominently sited at the head of a broad valley and set against a bowl of mountains behind it. The unusual arrowhead form and striking central bastion give the dam the appearance of citadel walls, emphasised by the uncluttered design with all machinery contained within two towers flanking the central portion of the dam wall and by the battered downstream face. The scheme played a key role in the realisation of the social agenda of NoSHEB by providing power to remote north highland communities and stimulating economic regeneration.

Mullardoch dam is the largest dam constructed by the North of Scotland Hydro Electric Board (NoSHEB) measuring 727 meters long and 48 meters high. The unusual arrowhead form of the dam was designed as a way to save materials during construction with the two inclined wings meeting on a small island (now submerged), the prominent central bastion playing an important role in providing sufficient weight to stabilise the joint. Had the dam been constructed as a single structure it would have been very costly due to the volume of materials required to build a gravity dam of this length.

The Affric / Cannich hydroelectric scheme, of which Mullardoch dam forms an integral component, was one of a large number of schemes developed in Scotland by the North of Scotland Hydro Electric Board (NoSHEB), formed after 1943 as a nationalised body to oversee the development of Scotland's resources for water power. The scheme played a key role in the realisation of the social agenda of NoSHEB by providing power to a remote community. Power generated on schemes in the southern Highlands, such as Tummel (see separate listings) was exported via the grid to the central belt, the profit from which subsidised the provision of power to remote north Highland communities and stimulated economic regeneration. Under the leadership of eminent chairman Sir Tom Johnston the board undertook developments throughout Highland Scotland and his aspirations saw the development of schemes in locations such as Loch Dubh near Ullapool and Storr Lochs on Skye. Johnstone's social aspirations and wider wishes to reinvigorate the economy of the Highlands ensured that schemes in remote areas formed a key part of the NoSHEB development plan.

All of the developments carried out by NoSHEB were subject to parliamentary approval and objections on the grounds of scenic amenity were common. In order to meet these objections the board appointed a panel of architectural advisers which included Reginald Fairlie (1883-1952), James Shearer (1881-1962) and Harold Ogle Tarbolton (1869-1947), appointed in 1943. Initially the role of the panel was to adjudicate on competition entries for designs, but by 1947 it had become one of designers. The panel had little control over the functional form of the buildings, as they left this to engineers, but they did influence the appearance and the style of the designs. The rigid views on the roles of engineers and architects during the design process resulted in the development of a style which can be characterised as vernacular modernism. This style is characteristic of many NoSHEB buildings and is a direct product of the strict role which engineers and architects played in the design process and of the increasing desire to harmonise buildings with the landscape.

The design of Mullardoch Dam is typical of Williamson's approach, with an innovative solution designed specifically to suit the requirements of a particular site. In the case of Mullardoch Dam the arrowhead plan was applied to make use of a small island (now submerged) in the middle of the loch where the two inclined walls meet. This allowed for significant savings in costs and materials over a more conventional design. Williamson was a prominent engineer who specialised in the design of dams following his work on the Galloway Hydro Electric scheme (see separate listings) in the 1930s. He acted as one of the chief engineering advisors to NoSHEB and was the lead engineer for a number of schemes until his death in 1953 after which the role passed to Williamson and Partners Ltd.

(Listed 2011 as part of Hydroelectric Power Thematic Survey)

References

Bibliography

National Archives of Scotland (NAS), Ref: NSE North of Scotland Hydro Electric Board Collection (1943 -1990); NAS, Ref: NSE1 North of Scotland Hydro Electric Board Minutes (1943-1990); NAS, Ref NSE2 North of Scotland Hydro Electric Board Annual Reports (1943-1990); Peter Payne, The Hydro: A Study of the Development of the Major Hydro-Electric Schemes Undertaken by the North of Scotland Hydro-Electric Board (1988); J Miller, The Dam Builders: Power from the Glens (2002) p52: Emma Wood, The Hydro Boys, (2002) pp 87,88; Scottish Hydro Electric, Power From The Glens (2000) p12.

About Listed Buildings

Historic Environment Scotland is responsible for designating sites and places at the national level. These designations are Scheduled monuments, Listed buildings, Inventory of gardens and designed landscapes and Inventory of historic battlefields.

We make recommendations to the Scottish Government about historic marine protected areas, and the Scottish Ministers decide whether to designate.

Listing is the process that identifies, designates and provides statutory protection for buildings of special architectural or historic interest as set out in the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997.

We list buildings which are found to be of special architectural or historic interest using the selection guidance published in Designation Policy and Selection Guidance (2019)

Listed building records provide an indication of the special architectural or historic interest of the listed building which has been identified by its statutory address. The description and additional information provided are supplementary and have no legal weight.

These records are not definitive historical accounts or a complete description of the building(s). If part of a building is not described it does not mean it is not listed. The format of the listed building record has changed over time. Earlier records may be brief and some information will not have been recorded.

The legal part of the listing is the address/name of site which is known as the statutory address. Other than the name or address of a listed building, further details are provided for information purposes only. Historic Environment Scotland does not accept any liability for any loss or damage suffered as a consequence of inaccuracies in the information provided. Addresses and building names may have changed since the date of listing. Even if a number or name is missing from a listing address it will still be listed. Listing covers both the exterior and the interior and any object or structure fixed to the building. Listing also applies to buildings or structures not physically attached but which are part of the curtilage (or land) of the listed building as long as they were erected before 1 July 1948.

While Historic Environment Scotland is responsible for designating listed buildings, the planning authority is responsible for determining what is covered by the listing, including what is listed through curtilage. However, for listed buildings designated or for listings amended from 1 October 2015, legal exclusions to the listing may apply.

If part of a building is not listed, it will say that it is excluded in the statutory address and in the statement of special interest in the listed building record. The statement will use the word 'excluding' and quote the relevant section of the 1997 Act. Some earlier listed building records may use the word 'excluding', but if the Act is not quoted, the record has not been revised to reflect subsequent legislation.

Listed building consent is required for changes to a listed building which affect its character as a building of special architectural or historic interest. The relevant planning authority is the point of contact for applications for listed building consent.

Find out more about listing and our other designations at www.historicenvironment.scot/advice-and-support. You can contact us on 0131 668 8914 or at designations@hes.scot.

Images

There are no images available for this record, you may want to check Canmore for images relating to GLEN AFFRIC HYDRO ELECTRIC SCHEME, MULLARDOCH DAM

There are no images available for this record.

Search Canmore

Printed: 27/04/2024 04:08