Scheduled Monument Consent / Consent Application

Crinan Canal, Cairnbaan - Ardrishaig - Replacement of lock walkways at Locks 1 & 4300032947

This decision is complete.

Summary

Replacement of lock walkways at Locks 1 & 4

Application Validated
23/11/2018
Target Date
17/01/2019
Status
Granted Without Conditions
Decision Date
17/01/2019

Related Designations

  1. Crinan Canal,Cairnbaan - ArdrishaigSM6501

    Designation Type
    Scheduled Monument
    Status
    Designated

    https://portal.historicenvironment.scot/designation/SM6501

Documents

Where documents include maps, the use of this data is subject to terms and conditions.

  • Type
    Application
    Title
    SMC application
    Download
  • Type
    Supplementary Information
    Title
    Location Plan, Lock 4 (Small Scale)
    Download
  • Type
    Supplementary Information
    Title
    Risk Assessment - Crinan Walkways
    Download
  • Type
    Supplementary Information
    Title
    Walkway Photographs
    Download
  • Type
    Supplementary Information
    Title
    Location Plan, Lock 1 (Small Scale)
    Download
  • Type
    Supplementary Information
    Title
    Canal Walkway Face View - Drawing
    Download
  • Type
    Supplementary Information
    Title
    Location Plan, Lock 4
    Download
  • Type
    Supplementary Information
    Title
    Location Plan, Lock 1
    Download
  • Type
    Supplementary Information
    Title
    Canal Walkway Side View - Drawing
    Download
  • Type
    Supplementary Information
    Title
    Canal Walkway Face View with Handrail - Drawing
    Download
  • Type
    Report on Handling
    Title
    Report on Handling
    Download
  • Type
    Decision Notice
    Title
    Decision Notice
    Download

Related Decisions

There are no other decisions related to this decision.

About Consent Application

Information in this record is about an application for Scheduled Monument Consent.

Most works, including repair, on scheduled monuments require Scheduled Monument Consent. We are responsible for determining applications for scheduled monument consent. Such applications will normally be determined within eight weeks of receipt of the application. We promote early pre-application discussions with prospective applicants. Contact Us for Application forms and further information.

Applications for Scheduled Monument Consent and the decisions taken on those applications are published on our online Portal. You can also view this information at our principal offices. Contact Us about this.

Where an application has been made to us but the person who made the application doesn't agree with the decision (or we haven't made a decision) they can appeal to Scottish Ministers.

Printed: 14/10/2019 16:37