Scheduled Monument Consent / Consent Application

St Andrews Cathedral and Priory and adjacent ecclesiastical remains - Installation of LED Floodlighting System300029884

This decision is complete.

Summary

Installation of LED Floodlighting System

Application Validated
02/07/2018
Target Date
26/08/2018
Status
Granted With Conditions

This decision may be subject to amendment as a result of an appeal lodged within the relevant time period.

Decision Date
16/08/2018

Related Designations

  1. St Andrews Cathedral and Priory and adjacent ecclesiastical remainsSM13322

    Designation Type
    Scheduled Monument
    Status
    Designated

    https://portal.historicenvironment.scot/designation/SM13322

Documents

Where documents include maps, the use of this data is subject to terms and conditions.

  • Type
    Application
    Title
    SMC application
    Download
  • Type
    Supplementary Information
    Title
    Existing Site Service Routes - Drawing
    Download
  • Type
    Supplementary Information
    Title
    Final Lighting Plan - Updated
    Download
  • Type
    Supplementary Information
    Title
    Final Lighting Design - 2 x Views
    Download
  • Type
    Supplementary Information
    Title
    Lighting Plan - Superceded
    Download
  • Type
    Supplementary Information
    Title
    Location and Site Plan
    Download
  • Type
    Supplementary Information
    Title
    Lighting Plan - Superceded
    Download
  • Type
    Supplementary Information
    Title
    Ecological Survey - Direct Ecology Limited
    Download
  • Type
    Supplementary Information
    Title
    Location of Bat Box - Drawing
    Download
  • Type
    Report on Handling
    Title
    Report on Handling
    Download
  • Type
    Decision Notice
    Title
    SMC Decision Notice
    Download

Related Decisions

There are no other decisions related to this decision.

About Consent Application

Information in this record is about an application for Scheduled Monument Consent.

Most works, including repair, on scheduled monuments require Scheduled Monument Consent. We are responsible for determining applications for scheduled monument consent. Such applications will normally be determined within eight weeks of receipt of the application. We promote early pre-application discussions with prospective applicants. Contact Us for Application forms and further information.

Applications for Scheduled Monument Consent and the decisions taken on those applications are published on our online Portal. You can also view this information at our principal offices. Contact Us about this.

Where an application has been made to us but the person who made the application doesn't agree with the decision (or we haven't made a decision) they can appeal to Scottish Ministers.

Printed: 26/06/2019 03:28