Listed Building

The only legal part of the listing under the Planning (Listing Buildings and Conservation Areas) (Scotland) Act 1997 is the address/name of site. Addresses and building names may have changed since the date of listing – see 'About Listed Buildings' below for more information. The further details below the 'Address/Name of Site' are provided for information purposes only.

Address/Name of Site

COULIGARTAN AQUEDUCT BRIDGE NO 3 (FORMER GLASGOW CORPORATION WATER WORKS)LB4153

Status: Designated

Documents

There are no additional online documents for this record.

Summary

Category
A
Date Added
06/09/1979
Supplementary Information Updated
21/12/2018
Local Authority
Stirling
Planning Authority
Stirling
Parish
Aberfoyle
National Park
Loch Lomond And The Trossachs
NGR
NS 45639 99789
Coordinates
245639, 699789

Description

Loch Lomond And Trossachs National Park Planning Authority

John F Bateman (engineer) and Alston & Gourlay (ironwork) 1856-9, some alterations 1860-64. 212 yard aqueduct bridge comprising iron trough carried on 3 battered masonry piers and steep battered masonry embankments at each end. Cast-iron trough to embankment sections; riveted wrought-iron to centre; coursed, bull-faced sandstone piers; whinstone rubble embankments. Sandstone ashlar cope to embankments. Conduit emerges from sandstone archway at each end; standard GCWW plain cast-iron railings. Security cover and railings added to embankment sections of trough 2007.

Statement of Special Interest

One of the five principal aqueduct bridges built as part of the first phase of the Glasgow Corporation Water Works system (see below for significance of the scheme as a whole) from 1856 onwards. The conduit is predominantly subterranean, but the geography at the top end of the scheme necessitated a number of aqueduct bridges, of which this is the second longest. At the time of building the surrounding area was uninhabited, there were no roads and the local stone was unsuitable for building. The engineer, John Bateman, described these aqueduct bridges as 'somewhat peculiar', and their design results from the lack of available building stone. The iron construction was much more expensive and technologically difficult than building an arched masonry aqueduct.

Because of the lack of lime for mortar, the masonry parts were originally drystone. In the 1860s it was felt that this made them too potentially unstable and they were consequently given mortar joints. The height of iron trough was also raised by about 2½ feet at about the same time to increase capacity.

The Glasgow Corporation Water Works system, which brings water down to Glasgow from Loch Katrine, was admired internationally as an engineering marvel when it was opened in 1860. It was one of the most ambitious civil engineering schemes to have been undertaken in Europe since Antiquity, employing the most advanced surveying and construction techniques available, including the use of machine moulding and vertical casting technologies to produce the cast-iron pipes. The scheme represents the golden age of municipal activity in Scotland and not only provided Glasgow with fresh drinking water, thereby paving the way for a significant increase in hygiene and living standards, but also a source of hydraulic power that was indispensable to the growth of Glasgow's industry as a cheap and clean means of lifting and moving heavy plant in docks, shipyards and warehouses. The civic pride in this achievement is visible in every structure connected with the scheme, from the neatly-detailed gates and railings along its route, to the massive masonry structures and iron troughs that carry the conduit and, in most cases, have withstood without failure or noticeable deterioration the daily pressure of many millions of gallons of water for well over 100 years.

Glasgow's Lord Provost, Robert Stewart (1810-66) was the driving force behind the implementation of a municipally-owned water scheme to provide clean water to Glasgow's rapidly increasing population. Loch Katrine was identified as a suitable supply and after some objections from various parties, an Act of Parliament authorising the scheme was passed in 1855. The scheme was built in two main phases following this Act and another 1885. The 1855 scheme, which was opened by Queen Victoria in 1859 and was fully operational by 1860, had been designed to allow for significant expansion as demand increased, and this work was carried in the 20 years following the opening. The 1885 Act allowed a second aqueduct to be built, which followed a slightly shorter course than the earlier scheme. The capacity of the second aqueduct was also expanded during the first half of the 20th century.

John Frederick Bateman (1810-1889) was chosen as the engineer for the scheme and construction work commenced in 1856. Bateman was to become one of the world's most eminent water engineers, and worked on a number of other water supply schemes in Britain, Europe and Asia. He was assisted by James Morrison Gale (1830-1905), who on the completion of the initial scheme in 1859 was appointed Water Engineer for the City of Glasgow, a post he held till 1902. Gale was responsible for over-seeing the incremental expansion of the first scheme during the 1860s and '70s and the building of the second aqueduct from 1885 onwards.

Previously listed as 'Duchray Valley, Aqueduct at NS45630/99792'. Upgraded C(S) to A following the thematic review of Loch Katrine water supply system in 2008.

References

Bibliography

No 1 Blairhulachan Contract, drawing No 31, dated 1856 (Scottish Water). Historic photograph (Scottish Water), circa 1875. Shown on 1st edition Ordnance Survey Map (circa 1864). RCAHMS and Jelle Muylle, Glasgow Corporation Water Works Loch Katrine Scheme: Loch Katrine to Milngavie (survey report, not published, 2007).

About Listed Buildings

Historic Environment Scotland is responsible for designating sites and places at the national level. These designations are Scheduled monuments, Listed buildings, Inventory of gardens and designed landscapes and Inventory of historic battlefields.

We make recommendations to the Scottish Government about historic marine protected areas, and the Scottish Ministers decide whether to designate.

Listing is the process that identifies, designates and provides statutory protection for buildings of special architectural or historic interest as set out in the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997.

We list buildings which are found to be of special architectural or historic interest using the selection guidance published in Designation Policy and Selection Guidance (2019)

Listed building records provide an indication of the special architectural or historic interest of the listed building which has been identified by its statutory address. The description and additional information provided are supplementary and have no legal weight.

These records are not definitive historical accounts or a complete description of the building(s). If part of a building is not described it does not mean it is not listed. The format of the listed building record has changed over time. Earlier records may be brief and some information will not have been recorded.

The legal part of the listing is the address/name of site which is known as the statutory address. Other than the name or address of a listed building, further details are provided for information purposes only. Historic Environment Scotland does not accept any liability for any loss or damage suffered as a consequence of inaccuracies in the information provided. Addresses and building names may have changed since the date of listing. Even if a number or name is missing from a listing address it will still be listed. Listing covers both the exterior and the interior and any object or structure fixed to the building. Listing also applies to buildings or structures not physically attached but which are part of the curtilage (or land) of the listed building as long as they were erected before 1 July 1948.

While Historic Environment Scotland is responsible for designating listed buildings, the planning authority is responsible for determining what is covered by the listing, including what is listed through curtilage. However, for listed buildings designated or for listings amended from 1 October 2015, legal exclusions to the listing may apply.

If part of a building is not listed, it will say that it is excluded in the statutory address and in the statement of special interest in the listed building record. The statement will use the word 'excluding' and quote the relevant section of the 1997 Act. Some earlier listed building records may use the word 'excluding', but if the Act is not quoted, the record has not been revised to reflect subsequent legislation.

Listed building consent is required for changes to a listed building which affect its character as a building of special architectural or historic interest. The relevant planning authority is the point of contact for applications for listed building consent.

Find out more about listing and our other designations at www.historicenvironment.scot/advice-and-support. You can contact us on 0131 668 8914 or at designations@hes.scot.

Images

There are no images available for this record, you may want to check Canmore for images relating to COULIGARTAN AQUEDUCT BRIDGE NO 3 (FORMER GLASGOW CORPORATION WATER WORKS)

There are no images available for this record.

Search Canmore

Printed: 20/04/2024 12:06